Miller’s Run Phase III – Pedestrian Bridge – Engineering Funded

Loyalsock Township has been awarded a grant through DCED’s Multimodal Transportation fund for the amount of $416,000. This is for the preliminary engineering of a pedestrian bridge over East Third Street and Miller’s Run in Loyalsock Township. The bridge will provide a safe crossing at the East Third Street and Northway Road intersection and will connect the neighborhoods of the township to the Susquehanna Riverwalk.